120-Ton Modular Chiller Plant Replacement

Vancouver, BC·Building operators / Commercial property managers / Strata councils

Woola Mechanical modernized an aging central cooling plant by replacing a single large chiller with four 30-ton modular units, providing approximately 120 tons of installed cooling capacity. Working within an existing mechanical room required planning for equipment removal and rigging, service isolation, piping modifications, electrical interfaces and controls integration. Our team coordinated the installation sequence and the associated technical trades to address access constraints and the building’s ongoing operational requirements.

The modular configuration was selected to support staged cooling output, operational flexibility and improved serviceability compared with dependence on one large machine. Woola managed the project from assessment and equipment coordination through installation and startup, giving the building operator one team to engage on schedule, technical decisions and system handover. For an owner facing a major capital replacement, the value was both a renewed central plant and a more predictable process for getting complex mechanical work completed in an occupied property.

Next step

Plan a central cooling plant upgrade.

Tell us about the property and we'll come back with a coordinator from the right division, a site visit, and a scope you can take to your council or owner.

24/7 emergency dispatch for contracted clients