Three-Generator Standby Power Infrastructure Project

West Kelowna, BC·Strata councils / Property owners / Facilities managers

Woola Power was engaged on a major standby-power infrastructure project involving three commercial generator systems for an established residential development. Delivering the installation required more than generator placement: the scope incorporated site preparation, engineered equipment pads, underground electrical routing, transfer equipment, equipment protection and coordination with the existing electrical infrastructure. The work brought together civil construction, electrical distribution, generator installation and the associated engineering and permitting interfaces.

Woola Power, Electrical and Build worked within a coordinated project structure, giving the customer one team to manage site readiness, construction sequencing, technical interfaces and commissioning planning. Bringing those scopes together reduced the need to reconcile competing contractor schedules and made it easier to address access and installation issues as the project advanced. For a development investing in long-term power resilience, Woola’s role was to manage the full delivery process, not simply supply the generator equipment.

Next step

Discuss a standby generator installation.

Tell us about the property and we'll come back with a coordinator from the right division, a site visit, and a scope you can take to your council or owner.

24/7 emergency dispatch for contracted clients