Woola Power
Woola/Woola Power/Maintenance & Inspections
Woola Power · Generator PM programs

Maintenance & Inspections

Scheduled preventative maintenance and full-system inspections for standby generators: engine, cooling, fuel, batteries, transfer switch, and controls, photo-documented every visit.

Woola Power
Call NowRequest Service
24/7 emergency dispatch for contracted clients
  • Complete-system inspections, not start-stop checks
  • Digital reports with prioritized deficiencies
  • Battery, fuel, and ATS failure points covered

When the grid drops, your generator becomes the building. Elevators, emergency lighting, fire pumps, alarm panels, and communications all depend on one engine starting within seconds and carrying the load for as long as the outage lasts.

That engine spends almost its entire life waiting. A boiler or rooftop unit runs every day and announces its problems early; a standby generator can hide a weak battery or a tank of degraded diesel for months, then fail during the one outage that counts. Preventative maintenance exists to close that gap, and it's the core of what Woola Power does for commercial buildings across British Columbia.

Why standby generators fail

Most unexpected generator failures trace back to small problems that nobody resolved: batteries near the end of their life, contaminated fuel, a slow coolant leak, a block heater that quietly quit, loose electrical connections, or a transfer switch deficiency that never showed up in a monthly exercise. None of these are expensive to fix when they're caught early. All of them are expensive when they surface mid-outage, with the building dark and tenants in the stairwells.

A real maintenance program is built to find exactly these issues. Confirming the unit starts and stops is not an inspection; it's a formality.

What a Woola Power maintenance visit covers

Every visit begins with a complete system inspection: engine, alternator, cooling, fuel, batteries and charging, automatic transfer switch, electronic controls, monitoring and alarms, operating hours, fluid levels, leaks, and general condition. From there, the program scope includes:

  • Engine oil and filter service to manufacturer schedules, with checks for contamination and abnormal wear
  • Cooling system service: coolant condition, radiators, hoses, belts, thermostats, and block heaters
  • Fuel system inspection of tanks, transfer pumps, piping, and filters, with sampling or polishing when warranted
  • Battery load testing, charger verification, and cable inspection
  • Automatic transfer switch inspection, including connections, mechanisms, controllers, and a full transfer sequence verification
  • Controls and monitoring: controllers, sensors, alarms, communication modules, and terminations
  • Generator exercising and operational testing under real conditions: performance, temperatures, charging, and output
  • Scheduled load bank testing where the application calls for it

Load bank testing and CSA C282 compliance, in-house

Woola Power owns its resistive and reactive load banks and performs annual CSA C282 testing with our own technicians rather than subcontracting it out. That keeps your compliance schedule in one set of hands and your test results in one report format, year after year. We're also factory-authorized for Generac, Kohler, and Cummins, so warranty work and OEM-level diagnostics happen on the same visit as your routine service.

The transfer switch gets equal billing in our programs. A perfectly maintained generator protects nothing if the switch between utility and standby power doesn't perform, so we verify the complete transfer sequence, not just the engine.

Documentation you can actually plan around

After every visit you receive a digital report with findings, photographs, service history, and deficiencies ranked in plain terms: what needs attention now, what we're monitoring, and what belongs in a future capital budget. Property managers use these reports for reserve fund planning, lifecycle forecasting, and replacement decisions, which means the maintenance program pays for itself twice: once in reliability, and again in budgeting you can defend to an owner or a strata council.

Buildings we maintain

Our programs run in commercial offices, strata and condominium towers, healthcare and assisted living facilities, municipal buildings, schools, hotels, industrial and manufacturing plants, data centres, and water and wastewater infrastructure. The common thread is that in each of these buildings, standby power is a life-safety system first and a convenience second.

A local team that knows your generator

The alternative to a structured program is discovering your generator's condition during an outage. With Woola Power you get the same local technicians visit after visit, a documented history of your specific unit, and a partner who treats communication and accountability as part of the service, not an extra. You'll never feel like a ticket number in a national queue.

Request a maintenance proposal
3D cutaway render of a standby diesel generator
Talk it through first

Describe the building and what's happening. A coordinator scopes the visit before anyone rolls a truck.

604-829-9156
Equipment we know

Equipment we service.

Each unit links to a plain-English walkthrough of what it does, what fails, and what to keep an eye on.

3D cutaway render of a standby diesel generator
Power
Lifespan · 25–35 years

Standby Generator

Life-safety power when the grid fails: elevators, exit lighting, fire pumps, and heat. In BC, annual CSA C282 testing is the law for many buildings.

Signs of trouble
  • ·Failed or skipped exercise runs
  • ·Wet-stacking from light loading
  • ·Aging fuel that's never been polished
What we maintain
  • Annual CSA C282 load-bank test
  • Oil, coolant, and battery service
  • Fuel polishing on rotation
3D cutaway render of an automatic transfer switch
Power
Lifespan · 20–30 years

Automatic Transfer Switch (ATS)

Decides when the building runs on grid or generator, and makes the swap automatically.

Signs of trouble
  • ·Failure to transfer during tests
  • ·Chatter or hum from the cabinet
  • ·Obsolete controller with no parts support
What we maintain
  • Transfer-time testing annually
  • Infrared scan of lugs and contacts
  • Exercise clock verification
Why Woola

How we handle it.

  • Complete-system inspections, not start-stop checks
  • Digital reports with prioritized deficiencies
  • Battery, fuel, and ATS failure points covered
  • Supports reserve fund and lifecycle planning
See all Woola Power services

Generator PM programs across Whistler, Squamish, West Vancouver, North Vancouver, Vancouver, Burnaby, and 12 more municipalities.

Next step

Book maintenance & inspections with Woola.

Tell us about the property and we'll get a coordinator in touch within one business day.

24/7 emergency dispatch for contracted clients